Orchard Rite Shaker Head Removal Safe Operating Procedures | General information | Almond farms 0:04 Before you start This video provides general information for workers on almond farms. Before you start work, your host employer will explain the exact safe operating procedure, machine instructions and personal protective equipment required at your site. This video supports training. It does not replace practical training, assessment, supervisor sign-off or a training record. English is the authoritative version. 0:39 Step 1 Training and Safety Potential risk. Workers unsure of the process may lead to unwanted events which may result in injury, fatality or damage to equipment Risk treatment. At the end of this training which includes the practical component if you are unsure of the process do not proceed contact your Supervisor and the Orchard Manager immediately If at any time during this process you feel unsafe you are authorised and expected to stop Contact your Supervisor and the Orchard Manager immediately 1:20 Step 2 Pre-start/safety meeting Potential risk. Employees not aware of traffic management requirements may lead to serious collision resulting in injury to operator and damage to equipment Poor communication when machinery is moved from block to block Employees with language barriers may not understand traffic management plans Employees taking short cuts through headlands may lead to collisions resulting in injury to employees and damage to equipment Risk treatment. Employees MUST attend morning pre-starts in front of the orchard activity board host employer management MUST communicate daily work plan and safety information which includes but not limited traffic management Team supervisors MUST reiterate daily work plan and safety matters their teams If there are language barriers an interpreter MUST be used to communicate information If traffic management changes throughout the day host employer management and supervisors are responsible for communicating changes to employees and updating the orchard activity board 2:37 Step 3 Pre start equipment that will be used to undergo the task Potential risk. -Injury -Incorrect operation -Damage to equipment Risk treatment. -Training for employees/Safe Operating Procedure -Wear PPE -Use applicable checklist 2:56 Step 4 Position Telehandler and shaker in suitable/safe position with forks underneath shaker head Potential risk. -Telehandler will not have enough room to safely operate. -Shaker head will slip off the forks causing property damage, as well as potentially causing injury. Risk treatment. -Ensure you have safely/correctly positioned both machines. -Make sure forks of telehandler are positioned correctly underneath and secured under the head of the shaker to ensure that it does not slip and cause any damage/injury 3:36 Step 5 Start disconnecting and capping all hydraulic and electrical connections to the head. As well as on the body of the shaker Potential risk. -Oil spills -Contamination of hydraulic system on shaker. -Electrical shorts Risk treatment. -Make sure all hoses that are disconnected are capped and plugged. -Switch of machines isolator 4:04 Step 6 Remove all suspension bolts and nuts to ensure shaker head comes away freely. Potential risk. -Shaker head will not move away safely, potentially causing it to slip/fall Risk treatment. -Ensure all hanger bolts and nuts are safely disconnected before you begin to move the head away from the body. 4:28 Step 7 Store head away in a safe and suitable location. Potential risk. -Shaker head will become a trip hazard -If not stored away correctly it could become damaged. Risk treatment. -Make sure shaker head is stored off the ground the eliminate the risk of a trip hazard, as well as keeping covered, preferably in a workshop to protect it from the elements 4:56 Step 8 Position and strap all disconnected hydraulic and electrical hoses to the shaker, and ensure they aren’t left hanging on the ground. Potential risk. -Trip hazard. -Damage to hoses -Running over hoses when reposition the machine to its parking area. Risk treatment. -Ensure that when you are securing your hoses to the machine that they are done so that they will not slip off at any time. 5:26 Step 9 Clean up after you have finished the job. Potential risk. -Trip hazards -Tools being ran over when you are moving equipment. Risk treatment. -Ensure that you pack everything up when you have finished with it, and that it is put back in its designated spot in the workshop 5:50 Step 10 Move and park shaker back it its designated parking area. Potential risk. -Other farm machinery. -People in the workshop Risk treatment. -Make sure that you follow the farms TFM when you are moving the shaker out of the workshop and parking it in its designated area. As well as chocking the wheels and isolating the machine 6:16 Step 11 Tagging out the machine once it is parked so that isn’t moved besides maintenance or approved persons. Potential risk. -Somebody could attempt to operate the machine which could cause damage. Risk treatment. -Ensure that the appropriate coloured lock and tag is fitted to the machine. 6:39 Qualifications and experience Qualifications and experience. All employees/ workers must be trained, hold relevant licenses, and be assessed as competent before operating any equipment on host employer sites. there must be safety induction records with the workers’ name on the records. where licenses are required a copy of this must be on site file or personal file. 7:07 Duties and responsibilities Duties and responsibilities. All employees/ workers must adhere to host employer policies and procedures and report any concerns and incidents immediately to their manager/ supervisor. it is the responsibility of both host employer onsite management and contractor companies to identify language barriers and provide interpreters where required. 7:37 Training required Training required. All employees/ workers must have been inducted to the site and deemed competent in relevant Safe Operating Procedure and site traffic management plans. site managers must sign off all Safe Operating Procedure before employees/ worker start work on site or equipment. training should be completed by a competent person or training organization. 8:05 Codes of practice and legislation Codes of practice and legislation. All employees/ workers must adhere to codes of practice, standards and guideline, whs and ohs acts and regulations. 8:22 Plant, equipment and PPE Plant, equipment and PPE. Job specific protective personal equipment (ppe) must be identified and worn when required (i.e. positive sealed goggles with a strap when using compressed air). PPE is a shared responsibility between your host employer and Orchard Tech. Your host employer will provide the PPE required for your task. If the required PPE has not been supplied, stop work and contact Orchard Tech. workers to wear all outdoor ppe where required – wear positive sealed eye protection, gloves, hat, sunburn cream, steel capped boots, long sleeve shirts and long trousers. hi viz clothing must be worn at all times. 9:18 Maintenance checks Maintenance checks. If a vehicle, plant, equipment, or machinery is found to be defective or damaged, it must be tagged with ‘out of service’ tag until repaired and isolation register completed. daily pre-start/ pre-shift checks and post-checks if required are to be completed and recorded in all instances. maintenance teams are responsible for all maintenance on equipment. workers can only undertake maintenance if they have been adequately trained in the relevant process. 9:58 Before work starts This video provides general information. Before you start work, your host employer will explain the exact procedure and provide practical training for your site. This video does not replace assessment, supervisor sign-off or a training record. If you do not understand something, use the English or talk to your supervisor at the host employer site. The host will provide you with an interpreter. Orchard Tech · hari@orchardtech.com.au · 0439 32 32 32